Cooling infrastructure specialists · Kenya

Kenya's cooling infrastructure
is leaking.
We fix that.

Cold rooms, conditioned spaces and air handling units across Kenya lose energy, humidity control and air quality through unsealed gaps and structural defects. We measure and seal them using proven Dutch methodology, executed by a local team.

Get in touch →
The problem

Leaks cost more than energy.

Across Kenya's cold rooms, conditioned process floors and air handling systems, the same problem appears: uncontrolled air infiltration and exfiltration. The consequences go well beyond high electricity bills.

Energy waste

Unsealed joints and gaps force compressors and air handling units to run almost continuously to maintain target conditions. Energy costs rise sharply, often far above what a properly sealed facility requires.

Air quality and contamination

In conditioned process environments, infiltration of uncontrolled ambient air introduces humidity, dust and contaminants. For pharmaceutical manufacturing, food processing and medical facilities, this is a direct product safety and compliance risk.

Temperature and humidity instability

Structural defects and unsealed penetrations make it impossible to maintain stable internal conditions. Cold rooms develop warm spots. Conditioned floors lose humidity control. Product quality and process reliability suffer.

Premature equipment failure

Cooling equipment that fights constant air infiltration runs harder and breaks down sooner. A single seal job can significantly extend equipment life and reduce capital expenditure.

Thermal image showing heat infiltration at roof joints
Roof jointsHeat entering through unsealed panel connections. Measured at a facility in Kenya.
Thermal image showing air leak at wall joint
Wall jointWarm air streaming in along a vertical panel seam. Temperature differential up to 10°C.
Thermal image showing multiple leak points at corner
Corner penetrationsMultiple leak points at a single corner joint, showing significant heat infiltration.
Who we work with

Any facility that needs controlled conditions

We work with operators across Kenya whose facilities require precise temperature, humidity or air quality control. If uncontrolled air is getting in or out, we can find it and fix it.

01

Food and agriculture

Cold rooms, post-harvest storage and flower export facilities

02

Pharma and healthcare

Medicine storage, cleanrooms, labs and medical cold chain

03

Industry and manufacturing

Conditioned process floors and air handling systems

04

Logistics and distribution

Refrigerated warehouses and cold chain distribution centres

05

Hospitality

Hotel and restaurant cold rooms and commercial refrigeration

Services

Measure. Find. Seal.

We use proven measurement methods to locate every leak precisely, then seal them with quality materials imported from the Netherlands. The same team does both.

Thermal camera inspection at facility door Retrotec blower door double fan setup

Thermal camera inspection · blower door pressure test (optional)

01

Measurement

Our primary tool is thermal imaging. A thermal camera identifies exactly where uncontrolled air is entering or leaving a facility and how much heat or humidity is being lost. Where precise quantification is needed, we add a blower door test, which pressurises the space at 50 Pascal and gives a certified leakage measurement.

You receive a written report within 24 hours with a full leak map, thermal images and a severity ranking.

  • Thermal imaging to map air infiltration and exfiltration points
  • Blower door pressure test, optional, for certified leakage measurement
  • Full leak map with severity ranking
  • Written report within 24 hours
02

Sealing

We seal every identified leak point using professional-grade materials suited to the conditions of the facility, rated for low temperatures, high humidity environments and process-critical spaces. Because we do both the measurement and the sealing, we know exactly what we are fixing.

A follow-up measurement confirms the result and provides documentation for audits, grants and compliance requirements.

  • Professional sealing of joints, penetrations and structural defects
  • Materials rated for the specific facility conditions
  • Follow-up measurement to confirm improvement
  • Documentation suitable for energy audits, grants and compliance
Inside a conditioned facility in Kenya Sealing work at facility joints

Facility inspection · sealing work

How we work

Fast, precise and fully documented.

We work around your operations. Most jobs are completed in one to two days with minimal disruption. You receive a full report whether you choose measurement only or measurement plus sealing.

One team, start to finish

The team that measures your facility is the same team that seals it. No contractors, no handover. We own the outcome.

Dutch materials, local execution

We use professional-grade sealing materials imported from the Netherlands, the same products used in European cooling and process infrastructure.

Done in one to two days

Measurement and sealing of a standard facility is typically completed within one to two working days. For larger facilities we assess the timeline up front.

Fully documented

You receive a measurement report, a leak map with thermal images, and a post-sealing verification report, useful for energy audits, grant applications and compliance.

Team

Dutch expertise, Kenyan presence.

Lynn, Stephen, Anthony and Bart previously worked together in Kenya on a sustainable energy business. They now bring that experience to cooling infrastructure.

Lynn Vanheule, Stephen Ojere, Anthony Maina and Bart Fugers in Nairobi

Lynn Vanheule

Growth Lead

Responsible for strategy, funding and partnerships, and for driving strategic sales and marketing.

Stephen Ojere

Sales and Logistics Lead

Manages daily sales operations, materials logistics and planning.

Anthony Maina

Technical Lead

Leads all technical operations on the ground, from diagnosis to sealing and monitoring.

Bart Fugers

Innovation Lead

Founder of kierenjagers.nl. Responsible for technical partnerships in Europe, product innovation and knowledge enhancement.

Contact

Let's talk about your facility

Tell us about your situation and we will respond within 48 hours. No obligation.

Or reach us at info@climatecontrolkenya.com · +254 737 096200

Ready to fix your facility?

We work with cooling infrastructure operators across Kenya. Get in touch and we will respond within 48 hours.

Get in touch →